Arrival of 6 more pieces of the MRS stripper

08.03.2022

Continuing the MRS Logística rail renovation project, this week Multiterminais unloaded 6 pieces totaling 194 tons from the customer Loram in Brazil. With a rail network inside the port to facilitate the departure of parts, Multiterminais is a strategic port for this type of operation.





other news

  • 1006/2026

    MultiRio invests in expansion and strengthens competitiveness with new portainers.

    Read more
  • 2212/2025

    Anna Beatriz Ferreira Costa and Maria Luiza da Silva Siquara are the grand winners of the Mutlterminais Christmas Drawing Contest!

    Read more

photos and videos

See full gallery

case studies

See all results
  • Gerdau's Industrial Plant in Ouro Branco

    Multitermiais partnered with the Gerdau group on the steel project in the city of Ouro Branco – MG. Multiterminais participated in all stages of the logistics process of this huge operation.

    Read more
  • Mercedes Benz: Total Parts Inventory Control

    The logistics process, from the import of parts, until the delivery to the Mercedes-Benz factory in Juiz de Fora is made by ALB. ALB is a joint venture between Multiterminais and Schenker International, one of the largest freight forwarders in the world.

    Read more

last news

View all news
  • 1006/2026
    MultiRio invests in expansion and strengthens competitiveness with new portainers.
    Read more
  • 2212/2025
    Anna Beatriz Ferreira Costa and Maria Luiza da Silva Siquara are the grand winners of the Mutlterminais Christmas Drawing Contest!
    Read more
  • 1507/2025
    Multiterminais' New Scanner goes into operation
    Read more